Decorated-style church by Frederick Marrable, 1852, in a prominent position in St Leonards. It has a four-stage south west tower built in 1872. Facing stonework and roofs in a
fair condition but the tracery stonework is in a very poor condition. Historic England has given advice on repair and funding options. Repairs to the south aisle roof and drainage have recently been carried out.Decorated-style church by Frederick Marrable, 1852, in a prominent position in St Leonards. It has a four-stage south west tower built in 1872. Facing stonework and roofs in a
fair condition but the tracery stonework is in a very poor condition. Historic England has given advice on repair and funding options. Repairs to the south aisle roof and drainage have recently been carried out.
Decorated-style church by Frederick Marrable, 1852, in a prominent position in St Leonards. It has a four-stage south west tower built in 1872. Facing stonework and roofs in a fair condition but the tracery stonework is in a very poor condition. Historic England has given advice on repair and funding options. Repairs to the south aisle roof and drainage have recently been carried out.

Historic England at Risk Register 2022: Here are eighteen heritage sites across Hastings and Rother on the list

Historic England has released its Heritage at Risk Register for 2022, with eighteen sites across Hastings and Rother being listed.

The register lists historic buildings and sites that are at risk of loss through neglect, decay or development, or are vulnerable to becoming so.

It aims to bring focus to places ‘in greatest need’ and Historic England is working with other organisations, and owners of the sites, to save them.

Most of the sites at risk in our local area can be seen pictured below, in addition to Hastings Town Centre, a Conservation Area in ‘poor’ condition, and a Romano-British iron working site in Beauport Park, Battle which, according to the register, has ‘extensive significant problems’ with its condition.

All information provided by Historic England.

Most of the sites at risk in our local area can be seen pictured below, in addition to Hastings Town Centre, a Conservation Area in ‘poor’ condition, and a Romano-British iron working site in Beauport Park, Battle which, according to the register, has ‘extensive significant problems’ with its condition.